📞 Call Now Get a Free Quote

Equipment · Bulldozers

Bulldozer transport.

From D3 class up to the machines that ship in pieces, moved by carriers who do it weekly.

Quote This Machine Call or Text 561-208-8595

Dozers are heavy for their footprint, which makes weight the binding constraint rather than length. A D6 sits comfortably on a lowboy; a D9 or D11 pushes into multi-axle territory and, at the top of the range, ships partially dismantled with the blade and ripper on a separate trailer.

The blade is the detail that catches people out. Left on, it usually makes the load over-width, which means permits in every state on the route. Removing it is often cheaper than permitting around it, and we will tell you which way works out better for your machine.

01

Usual trailer

Lowboy or RGN for most classes. Multi-axle configurations for D9 and above.

02

Blade handling

Frequently removed and shipped alongside to keep the load legal width. Worth pricing both ways.

03

Tracks matter

Steel tracks can damage decks; carriers use matting or specific trailers. Mention track type when you quote.

04

Escorts

Over-width or over-height dozer loads usually require pilot cars on at least part of the route.

Quote your bulldozer move

Real-time pricing from our verified driver network. No deposit, no payment info over the phone — just tell us what's moving and where.

We reply fast during business hours. Prices are all-inclusive — fuel, tolls, insurance and taxes. You never pay the driver directly.

Got it — your quote request is in. We'll call or text you shortly with a real-time, all-inclusive price.
Something went wrong sending your request. Please call or text us directly at 561-208-8595 — we answer fast.

Straight answers

Bulldozer transport questions

Can you ship a D11 dozer?

Yes, but not in one piece on a standard trailer. Machines that size typically travel dismantled — the tractor on a multi-axle lowboy, with the blade, ripper and sometimes the cab on separate trailers. It is a planned move rather than a next-day booking.

Do you remove the blade?

Usually the customer or their yard removes it, and the carrier secures it for transport. On many routes removing the blade avoids over-width permits entirely and saves more than the labour costs.

How long does dozer transport take?

The driving time is normal for the distance, but permitted oversize loads can only move during certain hours and not at all in some states on weekends or holidays. Build in a few extra days versus a standard equipment move.

Ready to ship?

Free quote, real-time pricing, no deposit to book. Don't wait — trucks fill up fast.

Get a Free Quote